Acceleration of works in Acheloos river basin

Due to the flood risk, projects for the maintenance even of unfinished works for the diversion of the river are being fast tracked. A contractor for the 1.8 million euro project has been asigned
Keywords
Τυχαία Θέματα
Acceleration,Acheloos